
Inspection of the HAUFE slat system
If the slat ceiling needs to be opened on a large scale, the slats can be removed individually from the mounting rails by unfixing them. For regular maintenance and control work, we offer a swiveling inspection flap which is adapted to the visual appearance of our system.
Basically, the HAUFE slat ceiling can be inspected very easily. After the slat connector has been slid back into the mounting rail, the slats are pressed together a little and released from the mounting rail holders. For quick access to installations above the ceiling, we recommend an inspection flap that opens downwards. It can be opened by simply sliding back the latch. The dimensions are 800 x 800 mm (other sizes on request).
The inspection element (see figure below) can be removed upwards or downwards. The mounting rail is cut even and provided with four latches for a downward removal. The opening is done by a simple downward removal.
You can find further information in the Technical Prospect.
Contact
- Tel+49 7042 27090-0
- Fax+49 7042 27090-90
- Mailinfo@haufe-deckensysteme.de
- AddZeppelinstr. 2, 74372 Sersheim, Germany
HAUFE Deckensysteme GmbH